Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 04/22/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.CR 771 Median Landscape and Irrigation Project
Last Updated: 04/22/2025 Category: Landscape Current Phase: Construction
CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.Manasota Key Sidewalk, Lighting & Landscaping
Last Updated: 04/14/2025 Category: Sidewalks Category: Landscape Category: Other Current Phase: Design Development
Gulf Boulevard Sidewalk, Lighting & LandscapingLandfill Scale House (Zemel Road)
Last Updated: 03/26/2025 Category: County Facilities Current Phase: Complete
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Hillsborough Boulevard Water Main Project
Last Updated: 03/24/2025 Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 03/13/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkHarold Avenue Generator Mitigation Grant
Last Updated: 01/31/2025 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.
William R. Gaines Jr. Veterans Memorial Park
Last Updated: 01/03/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.Cape Haze Wastewater Expansion
Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete