Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Projects

Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.

Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs
2025 Rotonda West/Pioneer Trail Annual Paving Program News Image

2025 Rotonda West/Pioneer Trail Annual Paving Program

Last Updated: 04/22/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.

Read More

CR 771 Median Landscape and Irrigation Project

CR 771 Median Landscape and Irrigation Project

Last Updated: 04/22/2025 Category: Landscape Current Phase: Construction

CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.

Read More

Manasota Key Sidewalk, Lighting & Landscaping

Manasota Key Sidewalk, Lighting & Landscaping

Last Updated: 04/14/2025 Category: Sidewalks Category: Landscape Category: Other Current Phase: Design Development

Gulf Boulevard Sidewalk, Lighting & Landscaping

Read More

Landfill Scale House (Zemel Road) News Image

Landfill Scale House (Zemel Road)

Last Updated: 03/26/2025 Category: County Facilities Current Phase: Complete

The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 03/24/2025 Current Phase: Construction

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 03/13/2025 Category: Sidewalks Current Phase: Construction

 Dorchester Street Sidewalk

Read More

Harold Avenue Generator Mitigation Grant

Harold Avenue Generator Mitigation Grant

Last Updated: 01/31/2025 Current Phase: Turnover and Closeout

This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center. 

Read More

William R. Gaines Jr. Veterans Memorial Park

William R. Gaines Jr. Veterans Memorial Park Sales Tax Project

Last Updated: 01/03/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete

Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.

Read More

Cape Haze Wastewater Expansion

Cape Haze Wastewater Expansion

Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us