Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

South Gulf Cove FY24 Bridge Rehabilitations

South Gulf Cove FY24 Bridge Rehabilitations

Last Updated: 05/13/2026 Category: Bridges Current Phase: Construction

South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072

Read More

Tom Adams Bridge Structural Repairs  News Image

Tom Adams Bridge Structural Repairs

Last Updated: 05/13/2026 Category: Bridges Current Phase: Construction

Tom Adams Bridge Structural Repairs 

Read More

Washington Loop over Prairie Creek Bridge Replacement News Image

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 05/13/2026 Category: Bridges Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 05/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.

Read More

Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion News Image

Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion Disaster Recovery Project Site

Last Updated: 05/12/2026 Category: Disaster Recovery Site

Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.

Read More

Don Pedro/Knight Island Beach Renourishment

Don Pedro/Knight Island Beach Renourishment

Last Updated: 05/12/2026 Category: Coastal Current Phase: Planning and Project Approval

The is a major renourishment of the Don Pedro/Knight Island shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Manasota Key Beach Renourishment

Manasota Key Beach Renourishment

Last Updated: 05/12/2026

The second major renourishment of the Manasota Key shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Ackerman Wastewater Expansion News Image

Ackerman Wastewater Expansion

Last Updated: 05/11/2026 Category: Utilities Current Phase: Construction

Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.

Read More

Allapatchee Shores Park - Stormwater and Parking Enhancements

Allapatchee Shores Park - Stormwater and Parking Enhancements

Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction

Allapatchee Shores Park - Stormwater and Parking Enhancements

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us