South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 05/13/2026 Category: Bridges Current Phase: Construction
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072Tom Adams Bridge Structural Repairs
Last Updated: 05/13/2026 Category: Bridges Current Phase: Construction
Tom Adams Bridge Structural RepairsWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 05/13/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 05/13/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.
Disaster Recovery Site - Manasota Key, Don Pedro, Knight Island Beach Erosion
Last Updated: 05/12/2026 Category: Disaster Recovery Site
Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.
Don Pedro/Knight Island Beach Renourishment
Last Updated: 05/12/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Manasota Key Beach Renourishment
Last Updated: 05/12/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 05/11/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking Enhancements