Last Updated: 12/22/2025 Category: Parks And Recreation Current Phase: Design Development
The Bayshore Grass Parking area was severely damaged by Hurricane Milton. A new assessment is required to confirm that the previous design will still meet current project needs. Submittals have been received, and an engineer of record has been confirmed. Contract negotiations are in progress, and once final designs are approved, the County will advertise the project for construction bids to begin reestablishing and hardening the parking area.Last Updated: 12/10/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, four pickleball courts, one basketball court, two sand volleyball court, fitness hub with shade structure, multi-purpose field area and exercise trail.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 12/10/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.Ainger Creek Boat Ramp Replacement
Last Updated: 12/09/2025 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Riverside Boat Ramp Replacement
Last Updated: 12/09/2025 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Completed 12/05/2025 Category: Parks And Recreation
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.
South County Regional Park Improvements-Final Phase
Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park - West Fishing Pier
Last Updated: 12/03/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.