Englewood East Amenity Replacement
Last Updated: 04/02/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 04/02/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 04/02/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Last Updated: 04/01/2026 Category: Parks And Recreation Current Phase: Design Development
The Bayshore Grass Parking area was severely damaged by Hurricane Milton. A new assessment is required to confirm that the previous design will still meet current project needs. Submittals have been received, and an engineer of record has been confirmed. Contract negotiations are in progress, and once final designs are approved, the County will advertise the project for construction bids to begin reestablishing and hardening the parking area.Last Updated: 04/01/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 04/01/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
Last Updated: 03/27/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.
South County Regional Park Improvements-Final Phase
Last Updated: 03/27/2026 Category: Parks And Recreation
South County Regional Park Playground Replacement
Last Updated: 03/27/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.