Last Updated: 08/03/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.Burnt Store Road East-West Connector
Last Updated: 08/03/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Burnt Store Water Reclamation Facility Expansion
Last Updated: 05/01/2026 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.Last Updated: 07/31/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksLast Updated: 08/06/2026 Category: Parks And Recreation Current Phase: Design Development
Cedar Point Pier ReplacementChamberlain Boulevard Sidewalk
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. SidewalkCharlotte County Street Lighting LED Conversion
Last Updated: 08/03/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County is continuing its effort to improve roadway lighting by converting older high-pressure sodium (HPS) fixtures to modern LED technology. The project delivers brighter, more reliable lighting while reducing energy use and long-term maintenance costs.






