Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Pirate Harbor Maintenance Dredge - Exterior News Image

Pirate Harbor Maintenance Dredge - Exterior

Last Updated: 07/30/2026 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system.  This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.

Read More

Peachland Boulevard at Harbor Boulevard Intersection Improvements News Image

Peachland Boulevard at Harbor Boulevard Intersection Improvements

Last Updated: 08/03/2026 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

Read More

Peace River Shores Boulevard Road Crossing Pipe Replacements  News Image

Peace River Shores Boulevard Road Crossing Pipe Replacements

Completed Category: Roadway

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Oyster Creek Flow Enhancement News Image

Oyster Creek Flow Enhancement

Last Updated: 07/31/2026 Category: Drainage Current Phase: Design Development

Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.

Read More

Oyster Creek Boardwalk News Image

Oyster Creek Boardwalk

Last Updated: 07/29/2026 Current Phase: Construction

Replacement of boardwalk at Oyster Creek Environmental Park.

Read More

Old Landfill Road Safety Improvements

Old Landfill Road Safety Improvements

Last Updated: 07/31/2026 Category: Roadway Current Phase: Design Development

Old Landfill Rd safety improvements.

Read More

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

Last Updated: 08/04/2026 Category: Bridges Current Phase: Design Development

NWPC Bridge Rehabilitation Chamberlain over Cheshire Waterway Project

Read More

Northwest Port Charlotte MSBU Bridge Rehabilitations

Northwest Port Charlotte MSBU Bridge Rehabilitations

Last Updated: 08/04/2026 Category: Bridges Current Phase: Construction

Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045

Read More

Northwest Port Charlotte Maintenance Dredging - Exterior

Northwest Port Charlotte Maintenance Dredging - Exterior

Last Updated: 07/30/2026 Category: Coastal Current Phase: Planning and Project Approval

Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU.  The project may also include the Juno Waterway.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us