Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 08/04/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gillot Boulevard Landscape and Irrigation Project
Last Updated: 08/03/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 08/03/2026 Current Phase: Planning and Project Approval
Gasparilla Road Sidewalk (Boca Grande)
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCGasparilla Road Intersections Signalization
Last Updated: 07/31/2026 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsLast Updated: 08/03/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayLast Updated: 07/15/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Last Updated: 07/31/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Last Updated: 07/15/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.