Ainger Creek Boat Ramp Replacement
Last Updated: 06/08/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Last Updated: 06/08/2026 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.
Last Updated: 06/08/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 06/08/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
Englewood East Amenity Replacement
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.South County Regional Park Playground Replacement
Last Updated: 06/04/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.
Disaster Recovery Site - Lift Stations
Last Updated: 06/01/2026 Category: Disaster Recovery Site Category: Utilities
Charlotte County experienced extensive damage to fencing, antenna systems and site infrastructure.Indian Trail/Springwater Dr Street Light Replacement
Last Updated: 06/01/2026 Category: Roadway Current Phase: Construction
Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old.