Rampart Boulevard Sidewalk Phase 3
Last Updated: 12/02/2025 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3Rotonda Bridge Rehabilitations (Phase 4 and 5)
Completed 12/02/2025 Category: Bridges
Rotonda Bridge Rehabilitations - Construction Phase 4 and 5 - Bridges 014060, 014063, 014100, 014101, 014104 and 014107
Rotonda MSBU Bridge Rehabilitations (6)
Completed 12/02/2025 Category: Bridges
Rotonda MSBU Bridge Rehabilitations (6) - #014105 and #014106Last Updated: 12/02/2025 Category: Roadway Current Phase: Design Development
Sandhill Boulevard WideningSouth Gulf Cove Bridge Rehabilitations
Completed 12/02/2025 Category: Bridges
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 12/02/2025 Category: Bridges Current Phase: Design Development
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 12/02/2025 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
South Gulf Cove Parallel Locks Project
Last Updated: 12/02/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Completed 12/02/2025 Category: Coastal
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.