Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 04/15/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionVarious Intersection Improvements
Last Updated: 04/15/2024 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Placida West Boat Ramp Expansion
Last Updated: 04/12/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Ainger Creek Boat Ramp Replacement
Last Updated: 04/12/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Bridgeless Barrier Islands Accessibility Study
Last Updated: 04/12/2024 Category: Other Current Phase: Planning and Project Approval
This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, goods, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, Don Pedro Island, and Knight Island/Thornton Key.Family Services Center - Phase 2
Last Updated: 04/12/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.South Gulf Cove Bridge Repairs - Construction
Last Updated: 04/09/2024 Category: Bridges Current Phase: Construction
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)Midway Boulevard Bridge over North Spring Lake - Bridge 014073
Last Updated: 03/29/2024 Category: Bridges Current Phase: Design Development
Midway Boulevard Bridge over North Spring Lake - Bridge #014073Rotonda Bridge Rehabilitations Design #5 - Bridges 014060, 014063 and 014100
Last Updated: 03/29/2024 Category: Bridges Current Phase: Design Development
Rotonda Bridge Rehabilitations Design #5 - Bridges 014060, 014063 and 014100