Harbor Boulevard Intersection Improvements
Last Updated: 08/03/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Harbor Heights Tennis/Pickleball Court Renovation
Completed
Reconstruction of the existing tennis/pickleball courts at Harbor Heights Park.Hillsborough Boulevard Water Main Project
Last Updated: 07/02/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Indian Springs Cemetery Bank Stabilization
Last Updated: 08/10/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017Indian Trail/Springwater Dr Street Light Replacement
Completed Category: Roadway
Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old.Last Updated: 08/03/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayKings Hwy Harborview Rd Intersection Improvements
Last Updated: 07/31/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Lakeview/Midway Wastewater Expansion
Last Updated: 04/27/2026 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Manasota Key Beach Renourishment
Last Updated: 08/03/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.