Harbor Boulevard Intersection Improvements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
Widen Kings Highway to a 4 lane divided roadwayManasota Key Beach Renourishment
Last Updated: 08/17/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardPeachland Boulevard at Harbor Boulevard Intersection Improvements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Riverside Drive Road Crossing Pipe Replacements
Last Updated: 08/17/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor DriveLast Updated: 08/17/2026 Category: Roadway Current Phase: Design Development
Sandhill Boulevard WideningLast Updated: 08/17/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock and Tender HouseSouthwest Landfill Operations Building Zemel Rd
Last Updated: 08/17/2026 Category: County Facilities Current Phase: Design Development