Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Peace River Shores Boulevard Railroad Crossing Enhancement  News Image

Peace River Shores Boulevard Railroad Crossing Enhancement

Last Updated: 01/21/2026 Category: Roadway Current Phase: Construction

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 01/21/2026 Category: Parks And Recreation Current Phase: Construction

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Oyster Creek Boardwalk News Image

Oyster Creek Boardwalk

Last Updated: 01/19/2026 Current Phase: Design Development

Replacement of boardwalk at Oyster Creek Environmental Park.

Read More

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Last Updated: 01/15/2026 Category: Bridges Current Phase: Construction

Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020

Read More

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Completed 01/15/2026 Category: Bridges

Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063

Read More

Bridge Scour Study and Countermeasures

Bridge Scour Study and Countermeasures

Last Updated: 01/15/2026 Category: Bridges Current Phase: Design Development

Bridge Scour Study and Countermeasures.

Read More

Burnt Store Water Reclamation Facility Expansion News Image

Burnt Store Water Reclamation Facility Expansion

Last Updated: 01/15/2026 Category: Utilities Current Phase: Design Development

This expansion project will increase wastewater treatment capacity for the Burnt Store service area.

Read More

Charlotte Harbor CRA - Melbourne Street Multi-Use Path News Image

Charlotte Harbor CRA - Melbourne Street Multi-Use Path

Last Updated: 01/15/2026 Category: Sidewalks Current Phase: Design Development

Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.

Read More

Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk News Image

Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk

Last Updated: 01/15/2026 Category: Roadway Current Phase: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us