Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Weir Inspection and Repair Design
Last Updated: 01/08/2025 Category: Drainage Current Phase: Planning and Project Approval
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm is being hired to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Last Updated: 01/07/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.Last Updated: 01/07/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2024 Road and Bridge Paving Program
Last Updated: 01/07/2025 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving ProgramCharlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 01/06/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 01/06/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 01/06/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 01/06/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Last Updated: 01/06/2025 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstruction