Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 12/02/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Last Updated: 12/02/2025 Category: Bridges Current Phase: Construction

Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020

Read More

Biscayne Bridge Rehabilitations

Biscayne Bridge Rehabilitations

Completed 12/02/2025 Category: Bridges

Road and Bridge FY23 Bridge Rehabilitations - #014049 and #014050

Read More

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Completed 12/02/2025 Category: Bridges

Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063

Read More

Bridge Scour Study and Countermeasures

Bridge Scour Study and Countermeasures

Last Updated: 12/02/2025 Category: Bridges Current Phase: Design Development

Bridge Scour Study and Countermeasures.

Read More

Buena Vista Waterways Dredging Project

Buena Vista Waterways Dredging Project

Last Updated: 12/02/2025 Category: Coastal Current Phase: Construction

Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU.  The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.   

Read More

Burnt Store Drainage Study News Image

Burnt Store Drainage Study

Last Updated: 12/02/2025 Category: Drainage Current Phase: Planning and Project Approval

The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out.  The study will recommend conceptual improvements to alleviate this flooding.

Read More

Burnt Store Road East-West Connector News Image

Burnt Store Road East-West Connector

Last Updated: 12/02/2025 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.

Read More

Canal Sediment Removal

Canal Sediment Removal

Last Updated: 12/02/2025 Category: Drainage Current Phase: Design Development

Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us