Disaster Recovery Site - Gulf Cove Water Booster Station
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Milton damaged the building's roof.
Disaster Recovery Site - Lift Stations
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Charlotte County experienced extensive damage to fencing, antenna systems and site infrastructure.
Disaster Recovery Site - Rotonda Water Reclamation Facility
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
The warehouse and storage buildings sustained catastrophic damage. One storage building was completely destroyed, with all four walls gone and water actively flowing through the former footprint.
Disaster Recovery Site - Water Booster Stations
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian caused widespread damage to water booster stations.
Disaster Recovery Site - West Port Water Reclamation Facility
Last Updated: 01/12/2026 Category: Disaster Recovery Site
Hurricane Ian caused significant damage throughout the wastewater treatment plant.
Disaster Recovery Site - Englewood Interconnect Water Booster Station
Last Updated: 12/08/2025 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged the Englewood water booster station.Hillsborough Boulevard Water Main Project
Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Lakeview/Midway Wastewater Expansion
Last Updated: 12/08/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Completed 12/05/2025 Category: Parks And Recreation
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.







