Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 07/02/2026 Category: Utilities Current Phase: Construction

This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Cultural Center Replacement News Image

Cultural Center Replacement

Last Updated: 07/06/2026 Category: County Facilities Current Phase: Planning and Project Approval

The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 07/10/2026 Category: Parks And Recreation Current Phase: Design Development

This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.

Read More

Ackerman Wastewater Expansion News Image

Ackerman Wastewater Expansion

Last Updated: 07/13/2026 Category: Utilities Current Phase: Construction

Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.

Read More

Peace River Shores Boulevard Road Crossing Pipe Replacements  News Image

Peace River Shores Boulevard Road Crossing Pipe Replacements

Completed Category: Roadway

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Fire Station 17

Fire Station 17 Sales Tax Project

Last Updated: 07/15/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construction of a new 4 stall apparatus bay Fire Station on the NW corner of Tamiami Trail & Green Gulf Blvd at the Tuckers Grade intersection in Punta Gorda.

Read More

Fire Station 3 Replacement

Fire Station 3 Replacement Sales Tax Project

Last Updated: 07/15/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

Read More

Fire Station 6 Replacement

Fire Station 6 Replacement Sales Tax Project

Last Updated: 07/15/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us