East Port Water Reclamation Facility Expansion
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Hillsborough Boulevard Water Main Project
Last Updated: 08/24/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Lakeview/Midway Wastewater Expansion
Last Updated: 08/24/2026 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Last Updated: 08/24/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2024 Road and Bridge Paving Program
Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
2024 Road and Bridge Paving Program2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 08/17/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.Bayshore Live Oak Playground Restroom
Last Updated: 08/17/2026 Current Phase: Planning and Project Approval
The Bayshore Live Oak Playground Restroom Replacement project will provide a new, modern restroom facility to better serve park visitors. The existing structure was damaged during Hurricanes Milton and Helene and is unsafe to repair or reuse. It will be replaced with a durable, code-compliant building designed for safety, accessibility, and ease of maintenance. The upgraded facility will enhance the overall user experience while supporting the long-term functionality and appearance of the park.