Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Sheriff Administration and Hardened 911 Facility News Image

Sheriff Administration and Hardened 911 Facility Sales Tax Project

Last Updated: 08/27/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurricane Charley which is still suseptible to hurricane damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be located in the same facility.

Read More

Supervisor of Elections Warehouse News Image

Supervisor of Elections Warehouse Sales Tax Project

Last Updated: 08/27/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction

Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities. 

Read More

Veterans Boulevard Intersection Improvements News Image

Veterans Boulevard Intersection Improvements

Last Updated: 08/27/2025 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.

Read More

Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 08/27/2025 Category: Bridges Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Cochran Boulevard Reclaim Extension News Image

Cochran Boulevard Reclaim Extension

Last Updated: 08/26/2025 Category: Utilities Current Phase: Complete

Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard. 

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 08/26/2025 Current Phase: Construction

This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 08/25/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 08/25/2025 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Cleveland Avenue Sidewalk Project

Cleveland Avenue Sidewalk Project Sales Tax Project

Last Updated: 08/25/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us