Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.
Disaster Recovery Projects DashboardEnglewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Sheriff Administration and Hardened 911 Facility
Last Updated: 08/27/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurricane Charley which is still suseptible to hurricane damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be located in the same facility.
Supervisor of Elections Warehouse
Last Updated: 08/27/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities.Veterans Boulevard Intersection Improvements
Last Updated: 08/27/2025 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/27/2025 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementCochran Boulevard Reclaim Extension
Last Updated: 08/26/2025 Category: Utilities Current Phase: Complete
Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard.Hillsborough Boulevard Water Main Project
Last Updated: 08/26/2025 Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Atwater Street Sidewalk Project
Last Updated: 08/25/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 08/25/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks
Cleveland Avenue Sidewalk Project
Last Updated: 08/25/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.