The purpose of the unit is to provide for the financing, design, construction, maintenance and operation of a stormwater management system, plan for future infrastructure needs for drainage, accrue or borrow funds for future work, and carry out such work for all primary drainage infrastructure as determined by the county engineer. The purpose shall include the financing of the county's National Pollutant Discharge Elimination System's (NPDES) permit and its requirements, as well as any costs associated with the total maximum daily loads (TMDLs) program. The purpose shall also include water quality monitoring and native and invasive aquatic plant control with the use of chemical, biological and mechanical methods.
Advisory Board Members
- Chair: David Marshall
- Vice-Chair: Bob Logan
- Dianne Quilty
- Stephen Rabinowitz
- Carmen Salome
Applications are being accepted to fill two positions with terms through October 31, 2027.
Meeting Dates
- Sep. 25, 2024 - CANCELED
- Dec. 11, 2024
Ordinances
- Ordinance Establishing the Unit
- Ordinance Establishing the Board
- Ordinance Adopting Countywide Standard for MSBU and MSTU Advisory Boards
Contact
Erica LeMaster
Community Liaison
Phone: 941.575.3626
Email: Erica.LeMaster@CharlotteCountyFL.gov
Charlotte County Public Works Department
7000 Florida Street,
Punta Gorda, FL 33950