Disaster Recovery Site - St. Paul Linear Park
Last Updated: 12/17/2025 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged park amenities, signage and guardrails.
Disaster Recovery Site - Tippecanoe Environmental Park
Last Updated: 12/17/2025 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged and removed environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Tringali Park
Last Updated: 12/17/2025 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 12/17/2025 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Alligator Creek Maintenance Dredge
Last Updated: 12/16/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Last Updated: 12/16/2025 Category: Bridges Current Phase: Construction
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Biscayne Bridge Rehabilitations
Completed 12/16/2025 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #014049 and #014050Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek
Completed 12/16/2025 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063
Bridge Scour Study and Countermeasures
Last Updated: 12/16/2025 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.