Learn about the ongoing Public Works repair projects to county roads and right of ways from damage caused by Hurricane Ian.
Last Updated: 09/19/2023 Category: Sidewalks Current Phase: Design Development
Dorchester Street SidewalkLast Updated: 09/19/2023 Category: Coastal Current Phase: Construction
Design and permitting of a maintenance dredge project in the Hayward waterway system.Willmington Boulevard Sidewalk
Last Updated: 09/19/2023 Category: Sidewalks Current Phase: Design Development
Willmington Boulevard SidewalkLast Updated: 09/19/2023 Category: Sidewalks Current Phase: Design Development
Gasparilla Pines Boulevard Pathway
Fruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 09/19/2023 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Fruitland Avenue Avenue of the Americas Sidewalk
Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 09/19/2023 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
Quesada Avenue sidewalk and pedestrian signalsLast Updated: 09/19/2023 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Marathon Boulevard Pathway
Sunset Boulevard East Sidewalk
Last Updated: 09/19/2023 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Sunset Boulevard East SidewalkSouth Gulf Cove Parallel Locks Project
Last Updated: 09/19/2023 Category: Coastal Current Phase: Design Development
Engineering design project of the South Gulf Cove Parallel Lock.