Learn about the ongoing Public Works repair projects to county roads and right of ways from damage caused by Hurricane Ian.
Supervisor of Elections Warehouse
Last Updated: 06/02/2023 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Landfill Scale House (Zemel Road)
Last Updated: 06/02/2023 Category: County Facilities Current Phase: Planning and Project Approval
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Harold Avenue Generator Mitigation Grant
Last Updated: 06/02/2023 Current Phase: Construction
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.Last Updated: 06/01/2023 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.Last Updated: 06/01/2023 Category: Parks And Recreation Current Phase: Design Development
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
William R. Gaines Jr. Veteran Memorial Park Trails and Boardwalk
Last Updated: 06/01/2023 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.Buena Vista Exterior Dredge Project
Last Updated: 06/01/2023 Category: Coastal Current Phase: Design Development
Buena Vista Access and connector channels maintenance dredge design.Last Updated: 06/01/2023 Category: Parks And Recreation Current Phase: Design Development
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Alligator Creek Maintenance Dredge
Last Updated: 06/01/2023 Category: Coastal Current Phase: Design Development
Design, permit, dredge, and construction oversight for project certification of a maintenance dredge event of Alligator Creek channel.