Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 04/29/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 04/29/2025 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsLast Updated: 04/29/2025 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionLast Updated: 04/29/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayLast Updated: 04/29/2025 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 04/29/2025 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Last Updated: 04/29/2025 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.North County Public Works Yard
Last Updated: 04/29/2025 Category: County Facilities Current Phase: Complete
A Public Works presence in North & Mid-County is critical for their operation. The old JB Yard on Kenilworth Blvd has been demoed for the new Charlotte Transit Facility. The County has purchased new property located at 18181 Sinatra Ave in Port Charlotte for the Public Works Yard.Peachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 04/29/2025 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.