Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Old Landfill Road Safety Improvements

Old Landfill Road Safety Improvements Sales Tax Project

Last Updated: 04/30/2025 Category: Roadway Current Phase: Design Development

Old Loveland Rd safety improvements

Read More

Placida West Boat Ramp Expansion News Image

Placida West Boat Ramp Expansion Sales Tax Project

Last Updated: 04/30/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 04/30/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 04/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIP

Read More

Atwater Street Sidewalk

Atwater Street Sidewalk Sales Tax Project

Last Updated: 04/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 04/29/2025 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Cleveland Avenue Sidewalk

Cleveland Avenue Sidewalk Sales Tax Project

Last Updated: 04/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 04/29/2025 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Gasparilla Road Intersections Signalization

Gasparilla Road Intersections Signalization

Last Updated: 04/29/2025 Category: Roadway Current Phase: Design Development

Signalization project  for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham Boulevards

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us