South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 04/10/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Last Updated: 04/10/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 04/10/2026 Current Phase: Planning and Project Approval
Design of a new multi-purpose Special Needs Saferoom and Community Support Facility.
Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 04/10/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWeir Inspection and Repair Design
Last Updated: 04/10/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Last Updated: 04/09/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.Alligator Creek Maintenance Dredge
Last Updated: 04/08/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Last Updated: 04/08/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.CR 771 Median Landscape and Irrigation Project
Last Updated: 04/08/2026 Category: Landscape Current Phase: Construction
CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.