Disaster Recovery Site - Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 06/02/2026 Category: Disaster Recovery Site
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Last Updated: 06/02/2026 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Gasparilla Road Intersections Signalization
Last Updated: 06/02/2026 Category: Roadway Current Phase: Design Development
Signalization project for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham BoulevardsGreater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 06/02/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 06/02/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Harbor Heights Tennis/Pickleball Court Renovation
Last Updated: 06/02/2026 Current Phase: Construction
Reconstruction of the existing tennis/pickleball courts at Harbor Heights Park.Kings Hwy Harborview Rd Intersection Improvements
Last Updated: 06/02/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance
Last Updated: 06/02/2026 Category: Roadway Current Phase: Design Development
The design, permitting, and construction of a new gated access trucking road into the mini-transfer station.Midway Boulevard Bridge over North Spring Lake - Bridge Rehabilitation
Completed Category: Bridges
Midway Boulevard Bridge over North Spring Lake - Bridge #014073