Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 08/08/2025 Category: Bridges Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Cleveland Avenue Sidewalk Project

Cleveland Avenue Sidewalk Project Sales Tax Project

Last Updated: 08/06/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

CR 771 Median Landscape and Irrigation Project

CR 771 Median Landscape and Irrigation Project

Last Updated: 08/06/2025 Category: Landscape Current Phase: Construction

CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.

Read More

Fire Station 3 Replacement

Fire Station 3 Replacement Sales Tax Project

Last Updated: 08/06/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 08/06/2025 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Gasparilla Pines Pathway

Gasparilla Pines Pathway

Last Updated: 08/06/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Gasparilla Pines Boulevard Pathway

Read More

Gillot Boulevard Landscape and Irrigation Project

Gillot Boulevard Landscape and Irrigation Project

Last Updated: 08/06/2025 Category: Landscape Current Phase: Planning and Project Approval

Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.

Read More

Harold Avenue Generator Mitigation Grant

Harold Avenue Generator Mitigation Grant

Last Updated: 08/06/2025 Current Phase: Turnover and Closeout

This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center. 

Read More

Sheriff Administration and Hardened 911 Facility News Image

Sheriff Administration and Hardened 911 Facility Sales Tax Project

Last Updated: 08/06/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurricane Charley which is still suseptible to hurricane damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be located in the same facility.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us