Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 07/13/2026 Current Phase: Planning and Project Approval
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 07/13/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Harbor Boulevard Intersection Improvements
Last Updated: 07/13/2026 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.Indian Springs Cemetery Bank Stabilization
Last Updated: 07/13/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017Indian Trail/Springwater Dr Street Light Replacement
Last Updated: 07/13/2026 Category: Roadway Current Phase: Construction
Remove and replace all HPS streetlights with new solar lights and poles. The light poles being replaced are 40 years old.Manasota Key Beach Renourishment
Last Updated: 07/13/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 07/13/2026 Category: Drainage Current Phase: Design Development
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 18.65 acres of Oyster Creek.Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardRiverside Drive Road Crossing Pipe Replacements
Last Updated: 07/13/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor Drive