Veterans Boulevard at Atwater Intersection Safety Improvements
Last Updated: 11/17/2025 Category: Roadway Current Phase: Design Development
This project includes the design and construction of new turn lanes and traffic signal improvements at the intersection of Veterans Boulevard and Atwater Street.Veterans Boulevard Intersection Improvements
Last Updated: 11/17/2025 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Willmington Boulevard Sidewalk
Last Updated: 11/17/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkLast Updated: 11/14/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Ballfield LED Lighting Conversion-ACDRP Football Fields
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-ACDRP Football FieldsBallfield LED Lighting Conversion-Carmalita Park Horse Arena
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-Carmalita Park Horse ArenaBayshore Live Oak Park - West Fishing Pier
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Bayshore Live Oak Park Seawall ReplacementBermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Last Updated: 11/14/2025 Category: Bridges Current Phase: Construction
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020