Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.
Disaster Recovery Projects DashboardEnglewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/08/2025 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement
Cleveland Avenue Sidewalk Project
Last Updated: 08/06/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.CR 771 Median Landscape and Irrigation Project
Last Updated: 08/06/2025 Category: Landscape Current Phase: Construction
CR 771 (Gasparilla Road) median and ROW landscape and irrigation construction between SR 776 and Marathon Boulevard.Last Updated: 08/06/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 08/06/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening
Last Updated: 08/06/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGillot Boulevard Landscape and Irrigation Project
Last Updated: 08/06/2025 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Harold Avenue Generator Mitigation Grant
Last Updated: 08/06/2025 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.
Sheriff Administration and Hardened 911 Facility
Last Updated: 08/06/2025 Category: Sales Tax Funded Category: County Facilities Current Phase: Construction
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurricane Charley which is still suseptible to hurricane damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be located in the same facility.