Weir Inspection and Repair Design
Last Updated: 09/02/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Last Updated: 09/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 09/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 09/01/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.Ainger Creek Bridge - Emergency Repair
Last Updated: 09/01/2026 Category: Bridges Current Phase: Construction
Ainger Creek Bridge - Emergency RepairAlligator Creek Maintenance Dredge
Last Updated: 09/01/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Bridge Scour Study and Countermeasures
Last Updated: 09/01/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 09/01/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 09/01/2026 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct a multi-use path on Parmely Street from U.S. 41 to Bayshore Road.