Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Don Pedro/Knight Island Beach Renourishment

Don Pedro/Knight Island Beach Renourishment

Last Updated: 07/06/2026 Category: Coastal Current Phase: Planning and Project Approval

The is a major renourishment of the Don Pedro/Knight Island shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Englewood East Amenity Replacement News Image

Englewood East Amenity Replacement

Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction

Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.

Read More

Gillot Boulevard Landscape and Irrigation Project News Image

Gillot Boulevard Landscape and Irrigation Project

Last Updated: 07/06/2026 Category: Landscape Current Phase: Planning and Project Approval

Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.

Read More

Manasota Key Beach Renourishment

Manasota Key Beach Renourishment

Last Updated: 07/06/2026

The second major renourishment of the Manasota Key shoreline.  This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.  

Read More

Myakka Park News Image

Myakka Park

Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

South County Regional Park Playground Replacement

South County Regional Park Playground Replacement

Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Design Development

Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.

Read More

Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 07/06/2026 Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 07/03/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 07/03/2026 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us