Tom Adams Bridge Structural Repairs
Last Updated: 07/06/2026 Category: Bridges Current Phase: Construction
Tom Adams Bridge Structural RepairsWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 07/06/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 07/06/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement
Atwater Street Sidewalk Project
Last Updated: 07/03/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 07/03/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 07/03/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 07/03/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Last Updated: 07/03/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkLast Updated: 07/03/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard Pathway




