Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 07/19/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Mid-County Library Hurricane Repairs
Last Updated: 07/19/2024 Category: County Facilities Current Phase: Design Development
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Last Updated: 07/19/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.
Supervisor of Elections Warehouse
Last Updated: 07/19/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.
Sheriff Administration and Hardened 911 Facility
Last Updated: 07/19/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Last Updated: 07/17/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
Last Updated: 07/05/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 07/05/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of a master plan through the park design process and phase 1 development.Last Updated: 07/05/2024 Category: Parks And Recreation Current Phase: Planning and Project Approval
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.