Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
South Gulf Cove Bridge Rehabilitations

South Gulf Cove Bridge Rehabilitations

Last Updated: 08/22/2025 Category: Bridges Current Phase: Turnover and Closeout

South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)

Read More

South Gulf Cove FY24 Bridge Rehabilitations

South Gulf Cove FY24 Bridge Rehabilitations

Last Updated: 08/22/2025 Category: Bridges Current Phase: Design Development

South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072

Read More

Washington Loop over Prairie Creek Bridge Replacement

Washington Loop over Prairie Creek Bridge Replacement

Last Updated: 08/22/2025 Category: Bridges Current Phase: Design Development

Washington Loop Road Bridge over Prairie Creek - Bridge Replacement

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 08/22/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More

Bissett Park

Bissett Park

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Construction

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Lake Betty Park

Lake Betty Park

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Construction

Park master plan for Lake Betty Park

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.

Read More

Lakeview/Midway Wastewater Expansion

Lakeview/Midway Wastewater Expansion

Last Updated: 08/21/2025 Category: Utilities Current Phase: Design Development

This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system. 

Read More

Myakka Park News Image

Myakka Park

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Design Development

Creation of a master plan through the park design process and phase 1 development.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us