Midway Boulevard Sidewalk (HB41)
Last Updated: 02/02/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.
Quesada Avenue Sidewalk and Pedestrian Signals
Completed 02/02/2026 Category: Sidewalks Category: Sales Tax Funded
Quesada Avenue sidewalk and pedestrian signals
Rampart Boulevard Sidewalk Phase 1
Last Updated: 02/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 1
Rampart Boulevard Sidewalk Phase 2
Last Updated: 02/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 2Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Completed 01/30/2026 Category: Bridges
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek
Completed 01/30/2026 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063
Bridge Scour Study and Countermeasures
Last Updated: 01/30/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Last Updated: 01/30/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 01/30/2026 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map and bridge pictures.




