Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Ainger Creek Boat Ramp Replacement
Last Updated: 03/19/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Rotonda Bridge Rehabilitations Design #3 - Bridges 014098 and 014099
Last Updated: 03/19/2024 Category: Bridges Current Phase: Construction
Rotonda Bridge Rehabilitation Design #3 - Bridges #014098 and #014099Family Services Center - Phase 2
Last Updated: 03/19/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Placida West Boat Ramp Expansion
Last Updated: 03/19/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Rotonda Bridge Rehabilitations Design #2 - Bridges 014061 and 014062
Last Updated: 03/19/2024 Category: Bridges Current Phase: Construction
Rotonda Bridge Rehabilitations Design #2 - Bridges 014061 and 014062
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 03/13/2024 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
Quesada Avenue sidewalk and pedestrian signalsLast Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Marathon Boulevard PathwaySunset Boulevard East Sidewalk
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Sunset Boulevard East Sidewalk