Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Peachland Boulevard at Harbor Boulevard Intersection Improvments News Image

Peachland Boulevard at Harbor Boulevard Intersection Improvments

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.

Read More

Charlotte Harbor CRA - Melbourne Street multi-use path News Image

Charlotte Harbor CRA - Melbourne Street multi-use path

Last Updated: 07/22/2024 Category: Sidewalks Current Phase: Design Development

Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.

Read More

Charlotte Harbor CRA - Parmely Street road widening and sidewalk News Image

Charlotte Harbor CRA - Parmely Street road widening and sidewalk

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.

Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.

Read More

Kings Highway Widening News Image

Kings Highway Widening

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

Widen Kings Highway to a 4 lane divided roadway

Read More

Sandhill Blvd Widening

Sandhill Blvd Widening

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

Sandhill Blvd Widening

Read More

Gillot & Blitman Waterway

Gillot & Blitman Waterway

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

Gillot Blvd roadway reconstruction

Read More

Veterans Boulevard Intersection Improvements News Image

Veterans Boulevard Intersection Improvements

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.

Read More

Cochran Boulevard at Veterans Boulevard Intersection Improvments News Image

Cochran Boulevard at Veterans Boulevard Intersection Improvments

Last Updated: 07/22/2024 Category: Roadway Current Phase: Design Development

The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.

Read More

Supervisor of Elections Warehouse News Image

Supervisor of Elections Warehouse Sales Tax Project

Last Updated: 07/19/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval

Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites. 

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us