Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 06/03/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWillmington Boulevard Sidewalk
Last Updated: 06/03/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkAlligator Creek Maintenance Dredge
Last Updated: 06/02/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.
Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Completed Category: Bridges
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Bridge Scour Study and Countermeasures
Last Updated: 06/02/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.
Disaster Recovery Site - Alligator Creek N. Access Channel and North Branch Main Canal
Last Updated: 06/02/2026 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways and shoaling.
Disaster Recovery Site - Buena Vista Access Channel
Last Updated: 06/02/2026 Category: Disaster Recovery Site
A significant amount of sediment was pushed into the lagoon creating navigation and environmental issues.
Disaster Recovery Site - Harbour Heights Access Channels
Last Updated: 06/02/2026 Category: Disaster Recovery Site
Hurricane Ian caused land washouts and runoff into MSBU waterways, with strong tides causing shoaling that reduced water depths, restricted flow, and created navigation hazards.
Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Last Updated: 06/02/2026 Category: Disaster Recovery Site Current Phase: Construction
Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)




