Don Pedro/Knight Island Beach Renourishment
Last Updated: 07/06/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Englewood East Amenity Replacement
Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 07/06/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 07/06/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Manasota Key Beach Renourishment
Last Updated: 07/06/2026
The second major renourishment of the Manasota Key shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.Northwest Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 07/06/2026 Category: Bridges Current Phase: Construction
Northwest Port Charlotte MSBU Bridge Rehabilitations - #014044 and #014045South County Regional Park Playground Replacement
Last Updated: 07/06/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 07/06/2026 Category: Bridges Current Phase: Construction
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072





