Learn about the ongoing Public Works repair projects to county roads and right of ways from damage caused by Hurricane Ian.
Bayshore Live Oak Park Fishing Pier (West)
Last Updated: 09/18/2023 Category: Parks And Recreation Current Phase: Design Development
Total replacement of the western fishing pier at Bayshore Live Oak Park.Charlotte Harbor CRA - Melbourne Street Sidewalks
Last Updated: 09/18/2023 Category: Sidewalks Current Phase: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 09/18/2023 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Various Intersection Improvements
Last Updated: 09/18/2023 Category: Roadway Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Last Updated: 09/18/2023 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayLast Updated: 09/18/2023 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.Last Updated: 09/18/2023 Category: Parks And Recreation Current Phase: Design Development
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Last Updated: 09/18/2023 Category: Parks And Recreation Current Phase: Design Development
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
William R. Gaines Jr. Veteran Memorial Park Trails and Boardwalk
Last Updated: 09/18/2023 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.