Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.
Disaster Recovery Projects DashboardEnglewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
South Gulf Cove Bridge Rehabilitations
Last Updated: 08/22/2025 Category: Bridges Current Phase: Turnover and Closeout
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 08/22/2025 Category: Bridges Current Phase: Design Development
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/22/2025 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWeir Inspection and Repair Design
Last Updated: 08/22/2025 Category: Drainage Current Phase: Planning and Project Approval
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Bayshore Live Oak Park - West Fishing Pier
Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Construction
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions, walking paths, and an improved parking lot.
Lakeview/Midway Wastewater Expansion
Last Updated: 08/21/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Design Development
Creation of a master plan through the park design process and phase 1 development.