Peace River Shores Boulevard Railroad Crossing Enhancement
Last Updated: 01/21/2026 Category: Roadway Current Phase: Construction
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardRiverside Boat Ramp Replacement
Last Updated: 01/21/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 01/19/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Last Updated: 01/15/2026 Category: Bridges Current Phase: Construction
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek
Completed 01/15/2026 Category: Bridges
Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063
Bridge Scour Study and Countermeasures
Last Updated: 01/15/2026 Category: Bridges Current Phase: Design Development
Bridge Scour Study and Countermeasures.Burnt Store Water Reclamation Facility Expansion
Last Updated: 01/15/2026 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.Charlotte Harbor CRA - Melbourne Street Multi-Use Path
Last Updated: 01/15/2026 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street Road Widening and Sidewalk
Last Updated: 01/15/2026 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.









